Skip to main content
HomeCase StudiesSeries B FinTech
Financial Services

Migrated 2TB PostgreSQL Cluster with Zero Downtime

4 weeks
3 engineers
Series B FinTech
PostgreSQLDockerAWSTerraformDebezium
$4,500
Monthly Savings
Zero
Downtime
340%
TPS Improvement
Zero
Data Loss
Database Migration Results
Metric
Before
After
TPS
50K (ceiling)
170K+ +340%
Query Latency
Baseline
-40% Faster
Monthly Cost
On-prem ops
-$4,500/mo Saved
Downtime
Risk window
Zero seconds Seamless
CDC Migration Pipeline
1
PostgreSQL
Source (on-prem)
2
Debezium
WAL capture
3
Kafka
Stream events
4
Aurora
Target (AWS)
Zero-downtime PostgreSQL CDC migration architectureZero-downtime PostgreSQL CDC migration architecture
CDC Migration Pipeline — 2TB Migrated with Zero Downtime

The Challenge

Legacy on-prem PostgreSQL cluster handling 50K TPS was hitting I/O ceilings. Zero downtime required for payment processing pipeline.

✗2TB database with 400+ tables and complex FKs
✗50K TPS at peak — no maintenance window possible
✗Regulatory requirement for zero data loss
✗Legacy schema with no partition strategy

Our Solution

CDC-based migration using Debezium, streaming WAL changes to Aurora while keeping both systems in sync during 72-hour cutover.

Deployed Debezium CDC connectors for real-time WAL capture
Parallelized initial data load across 8 worker threads
Built automated checksum validation per table
Implemented traffic-splitting proxy for gradual cutover
Ran both systems in parallel 72 hours before switch
Results & Impact

Query latency dropped 40%. Database handles 2x previous throughput.

Project Timeline

Week 1
Schema analysis, Aurora provisioning, Debezium setup
Week 2
Initial data load — 2TB in 18 hours
Week 3
CDC streaming validated — lag under 500ms
Week 4
72-hour parallel run, validation, final cutover
C

"Zero downtime on a 2TB migration. Our board was skeptical — CloudLink proved them wrong."

CTO
Series B FinTech

Facing a Similar Challenge?

Our engineers have solved this exact problem before. Get a free architecture review and see what's possible.

Get Free AuditAll Case Studies
SOC2 Certified
15-Min SLA
99.99% Uptime
Money-Back Guarantee
7
Focused Service Paths
B2B
Cloud Operations Focus
Clear
Scope Before Delivery
Written
Technical Next Steps
Start with a scoped technical conversation. We document the current state, constraints, and next step before recommending work.
CloudLink delivery approach
Want Similar Results?
See how CloudLink can transform your infrastructure.
Get Your Free Architecture Review
Evidence-led reviewScope confirmed firstTechnical next steps
Scope confirmed in writing Clear project boundaries Recommendations tied to evidence